What a thrill it was to see a HUGE crane placing four wooden roof rafters, each weighing 3 tons, over the office area  and the residence. Additionally, a MASSIVE steel beam was positioned over the training hall. This week, the contractor expects to put the actual sheets of roofing tin over the first third of the building.